TP Bennett
O2 commisioned TP Bennett to create and design the fit-out and refurbishment of their existing offices as well as a new office building which includes the design of a new link building to unite the two together into one flowing development where staff and visitors can interact with each other.
The overall scheme combines sustainable design with flexibility whilst incorporating O2's brand ideals of open, bold, clear and connecting into the working culture of the organisation.
Optima's Kinetic glass sliding doors within Optima 117 single glazed screens were installed into the building to maximise office space. This door was used to negate the need for a swinging door and to add extra class to the installation which was obatined with the added effect of manifestation.
Revolution 97 double glazing was used to achieve high performance whilst achieving excellent acoustic ratings and design aesthetics.
Registered Architects can download the following on Optima's Website:
Register as an Architect or Designer to obtain access.