BDG Workfutures
GIS supplied and installed coloured transparent films to interior glazing. The pattern was to remain random with different colours used on each elevation with different spacing between each strip giving the office a unique look.
The project was split over six floors and took eight weeks to complete. GIS also supplied frosted films to exterior facing glass, solar control films to roof glazing and internal DDA dots across all floors.
Registered Architects can download the following on Optima's Website:
Register as an Architect or Designer to obtain access.
Order our Designer's Guide on a USB!
Including: