Deeley Construction

George House, Herald Avenue, Coventry

Value: £1m +

Glass wall partition project optymasystems.com Deeley Construction

Architect:

Square Dot

Products Installed:

  • Clerestory Glazing
  • Optima 97 Advanced drywall
  • Optima 117
  • Kinetic Sliding Doors
view product gallery

Project Case Study

West Midlands Construction company Deeleys, moved into purpose built offices in early 2008.  Optima's contracting partner - East Midlands based Moda Interiors, carried out the installation within Deeleys new premises.

The office cross walls and break out areas were constructed of Optima 97 with clerestory glazing which enabled the solid areas to become features and the natural light of the buildings location to be maximised.

On the office fronts, Optima 117 single glazed partitioning and Kinetic Sliding glass doors were specified giving the client high acoustics as well as clean minimalist lines that the architect was looking for.

Please contact us to obtain advice on using our partitioning systems in your project.

All fields are mandatory

 
Captcha
 
(Please enter this code exactly as it appears above.)
 

How We Assist:

Did you know?

Registered Architects can download the following on Optima's Website:

Register as an Architect or Designer to obtain access.